Laminate Floor's Ruined.
Pipe Burst Last Night.
Tenant Moves Friday.

UK Flooring Response delivers emergency floor replacement when water damage, tenant damage, or failed installations can't wait. We strip water-damaged flooring, dry subfloors, and install new—48-72 hour turnaround from disaster to walkable.

Strip today. Dry tomorrow. New floor Wednesday. Tenant Friday.

NVQ Level 2 floor layers specialising in fast-turnaround vinyl, laminate, LVT, and carpet installation. Underfloor heating compatible. DPM installation. Subfloor levelling. Insurance quotes accepted. We work to BS 8203 flooring standards.

NVQ Level 2 Certified
BS 8203 Compliant
48-72hr Turnaround
🇬🇧Insurance Work Welcome

Emergency Flooring Services

The ones landlords need when tenancies start Monday

💧

Water-Damaged Floor Replacement

Laminate/wood flooring buckled after leak. We strip damaged floor, dry subfloor with dehumidifiers (24-48 hours), test moisture content (<75g/m² for new flooring), install replacement. Laminate: click-lock system, 5mm underlay, expansion gaps. Average bedroom: 2-3 days start to walkable. Insurance companies want moisture readings before new floor goes down—we provide them.

🏚️

Vinyl & LVT Installation

Luxury vinyl tile or sheet vinyl for kitchens, bathrooms, high-traffic areas. We prep subfloor (level to ±3mm over 2m), apply acrylic primer, then glue-down or click-lock system. LVT looks like wood/stone, waterproof, durable. Takes 1-2 days including adhesive curing. Ideal for rental properties—hard-wearing, wipes clean, tenant-proof. 15-20 year lifespan.

🔲

Laminate & Engineered Wood

Click-lock floating floor systems. We install 5mm acoustic underlay (footfall noise reduction + DPM), lay laminate/engineered planks with staggered joints, leave 10mm expansion gap at walls (covered by beading). AC4/AC5 commercial-grade laminate for rentals (scratch/impact resistant). Average room: 1 day installation, walkable immediately. 10-15 year warranty.

🔥

Underfloor Heating Compatible

Specialist install over UFH systems (wet or electric). Max floor build-up 18mm to preserve heat efficiency. We use UFH-rated underlay (thermal conductivity >0.15 W/mK), bond-down method for engineered wood, or floating LVT. Commission UFH before flooring (gradually increase temp over 7 days), then install. Must maintain 27°C surface temp max to avoid floor damage.

⚖️

Subfloor Levelling & DPM

Uneven concrete subfloor (>5mm deviation) = cracked tiles, laminate squeaks, vinyl ripples. We apply latex self-levelling compound (poured at 3-10mm depth, self-levels, walkable in 2-4 hours). Or install 6mm plywood over floorboards to create stable base. Ground-floor concrete needs DPM (damp-proof membrane): 1200 gauge polythene sheet lapped 150mm, taped joints. Essential—damp destroys flooring within months.

🛋️

Carpet & Gripper Install

Budget rental carpet to luxury Axminster. We fit gripper rods around perimeter (nailed 6mm from wall), lay cloud underlay (9-12mm thick for comfort), stretch carpet with knee-kicker and power stretcher (prevents ripples), trim edges. Standard bedroom: 3-4 hours. Stair carpet: 4-6 hours (each tread tucked properly). Heavy-duty contract carpet for rental properties lasts 7-10 years.

Fast Turnaround Flooring

Because insurance deadlines and tenancy starts don't wait

48-72hr
Typical Turnaround
BS 8203
Flooring Standard
NVQ L2
Qualified Fitters
10-15yr
Product Warranty

Book Emergency Flooring

Tell us what's happened and when you need it fixed